More wall cementing and electrical work is being done. Final preparations for the roof, and floors are being levelled out. Bathroom plumbing has gone in as well.
For the report in PDF format please click here, or click on an image below for a slideshow.
The roof is going up today April 20, 2024!
Walls are being cemented and door frames completed.
For the report in PDF format please click here, or click on an image below for a slideshow.
Walls continue to be cemented. Rafters and electrical continued. We also received a donation of the roof from Johanes Schultz.
For the report in PDF format please click here, or click on an image below for a slideshow.
Rafters are going up, more electrical conduits are being put in, and walls are being cemented.
For the report in PDF format please click here, or click on an image below for a slideshow.
Walls have gone up. The exterior drains and septic tanks installed.
For the report in PDF format please click here, or click on an image below for a slideshow.